|
 |
 |
|
|
| |
|
|
The
Green Community (2003)
As
a Board Member of Emicool Green Technologies Director
Mario Seneviratne was responsible for directing
the project at the Board level including reviewing
and critiquing the designs carried out by primary
project consultant.
The total planned capacity of this District Cooling
Plant was 12,000T
Palm Crescent
(2004)
Chilled Water Network Development
-
Responsible
for carrying out hydraulic and stress analysis for the chilled
water distribution network.
- This is one of the first projects to use pre-insulated GRP
piping for distribution of the chilled water.
-
Pipe
sizes ranged from 800mm to 1200mm Dia.The stress modeling
included the stresses due to the pipe crossing of two
marine bridges.
-
The
estimated capacity of the chilled water network is in excess
of 100,000 T.
|
 |
|
Mirdiff
Development - (2003)
Representing
the owner for this development was responsible for coordinating the
Chiller plant work with the primary consultant for the phased development
of this commercial and residential complex.
Detailed thermal analysis, life cycle costing and witnessing of factory testing
of the chillers were highlights of the project assignment. The installed capacity
of this District Cooling Plant was 5000T.
Al
Musallah Towers (2003)
Implemented
an energy management program, primarily working on the centrifugal
chiller plant.
Savings
in excess of US $ 250,000 per year was achieved by the programmed
operation of the chillers and its auxiliaries.
|
|
West
3, 404, DAFZA| Dubai,
UAE | Tel: +971 4 299 7764 | Fax: +971 4 299 7769
|
 |