New Salam Store in Wafi Mall
Phase V Extension
The
fit out of the Salam Department Store at the Wafi
City entails the fit out of a 10,000 Sq Meter department
store in an existing facility, requiring interface
with new and existing installations.
Ramada
Hotel – Dubai
Replacement of Hot and Cold Water
Pipes and Accessories
The entire
piping system of the hotel had corroded in less than 10 years
of operation causing damage to the finishes and loss of revenue
due to rooms not being available. Working for a design build
contractor a turnkey solution was offered to the owner, resulting
in the replacement of all the hot and cold water piping in this
172 room hotel