Engineers and Project Managers for the first LEED™ Green Building in Dubai, U.A.E and the Middle East
 
     

The New Salam Store in Wafi Mall
Phase V Extension


The fit out of the Salam Department Store at the Wafi City entails the fit out of a 10,000 Sq Meter department store in an existing facility, requiring interface with new and existing installations.


Ramada Hotel – Dubai
Replacement of Hot and Cold Water
Pipes and Accessories

The entire piping system of the hotel had corroded in less than 10 years of operation causing damage to the finishes and loss of revenue due to rooms not being available. Working for a design build contractor a turnkey solution was offered to the owner, resulting in the replacement of all the hot and cold water piping in this 172 room hotel

Project Title:
The New Salam Store in Wafi Mall Phase V Extension

Client:
Salam International


Engineers & Project Managers:
Green Technologies FZCO

Scope of Work Includes:

- Design development of   the MEP systems.
- Integration with new and   existing installations.
- Upgrading of systems to   meet ID requirements.
- Contract execution in an   Operating shopping mall.

Project Title:
Ramada Hotel – Dubai
Replacement of Hot and Cold Water Pipes and Accessories.

Scope of Work Includes:

- Replacement of all piping   with polymer based   piping.
- Replacement with only   localized shutdowns.
- Hotel operations being   maintained.
- 10 year unconditional   warranty being provided.