GOLDEN MILE 3, DUBAI, UNITED ARAB EMIRATES
The Golden Mile 3 project is to be built in Palm Jumeirah, Dubai, UAE with a built-up area of 309,190 sq.ft., consisting of 9 functional floors for offices, a ground floor for retail and lobbies, and 3 basement parking areas.
Project Team:
Client: | Nakheel |
Architects / Landscape Architect | DSA Architects |
Mechanical & Plumbing : | RPW Consulting Engineers |
Electrical Engineer : | CKR Consulting Engineers |
Construction Project Manager : | EllisDon |
Commissioning Authority : | Prime Technologies |
LEED ® Consultant: | Green Technologies FZCO |
Project Features:
- Energy savings of 20% – 30%
- Water savings of 40% – 50%
- Thermal comfort – to maintain indoor temperatures in the range of 24±2 °C and Relative Humidity (RH) between 50% & 60%
- CO2 monitoring and control of air quality improvements
- Daylighting and views
- Explore possibility of using renewable energy sources and technologies for powering selected equipment.
Read More
Description:
The Owner, Nakheel, in keeping with their commitment to sustainability, engaged the services of Green Technologies, to conduct a LEED Assessment for the project. The LEED Assessment carried out with the Project Team on 10th April 2008, indicated that the project is likely to achieve a LEED Gold certification under the LEED for Core and Shell rating system of the United States Green Building Council (USGBC).