District Cooling Plant Design with Stellar LLC
Project Team:
Client: | Stellar |
Architects: | Al Saraya Engineering Consultants |
Engineers: | RJ Crocker and Partners Consulting Structural Engineers |
Project Managers: | Green Technologies FZCO |
MEP ® Consultant: | SEED Engineering Consultants |
Project Features:
DOWNTOWN JEBEL ALI – 20,000 TR CHILLED WATER PLANT
- Designing of the Mechanical and Electrical plant and systems
- Designing of the Architectural and Structural
- Coordination and provision of 11KV systems as per DEWA requirements
- Coordination and interfacing with the District Cooling piping network
- Stress analysis of the condenser and chilled water piping systems
- Controls and Plant automation
- Contract (Technical ) documentation
JUMEIRA VILLAGE SOUTH – 55,000 TR COOLING CAPACITY
- Designing of the Mechanical and Electrical plant and systems
- Designing of the Architectural and Structural
- Coordination and provision of 11KV systems as per DEWA requirements
- Coordination and interfacing with the District Cooling piping network
- Stress analysis of the condenser and chilled water piping systems
- Controls and Plant automation
- Contract (Technical ) documentation
Read More
Description:
The projects consists of turnkey delivery of a district cooling system design and reticulation chilled water piping which includes the option of using a modular chiller plant. These plants are designed to supply specific cooling TR of 40°F (4.4°C) chilled water with a 16°F (8.9°C) ΔT at a specific cooling tower flow at 93.4°F (34.1°C) to 106.2°F (41.2°C).
Green Technologies scope of work included the Review, Comment and Modification and development of Structural Design Drawings of the Project